ADS Controlling risk factors project management | site economics

Controlling risk factors project management

 on Monday, October 24, 2016  

ADS
Various project management, requirements gathering, and planning methodologies have been developed for specific categories of implementation problems. Strategies have also been devised for ensuring that users play appropriate roles throughout the implementation period and for managing the organizational change process. Not all aspects of the implementation process can be easily controlled or planned. However, anticipating potential implementation problems and applying appropriate corrective strategies can increase the chances for system success

Managing Technical Complexity
Projects with challenging and complex technology for users to master benefit from internal integration tools. The success of such projects depends on how well their technical complexity can be managed. Project leaders need both heavy technical and administrative experience. They must be able to anticipate problems and develop smooth working relationships among a predominantly technical team. The team should be under the leadership of a manager with a strong technical and project management background, and team members should be highly experienced. Team meetings should take place frequently. Essential technical skills or expertise not available internally should be secured from outside the organization.

Formal Planning and Control Tools
Large projects benefit from appropriate use of formal planning tools and formal control tools for documenting and monitoring project plans. The two most commonly used methods for documenting project plans are Gantt charts and PERT charts. A Gantt chart lists project activities and their corresponding start and completion dates. The Gantt chart visually represents the timing and duration of different tasks in a development project as well as their human resource requirements (see Figure 14.4). It shows each task as a horizontal bar whose length is proportional to the time required to complete it.

Although Gantt charts show when project activities begin and end, they don’t depict task dependencies, how one task is affected if another is behind schedule, or how tasks should be ordered. That is where PERT charts are useful. PERT stands for Program Evaluation and Review Technique, a methodology developed by the U.S. Navy during the 1950s to manage the Polaris submarine missile program. A PERT chart graphically depicts project tasks and their interrelationships. The PERT chart lists the specific activities that make up a project and the activities that must be completed before a specific activity can start, as illustrated in Figure 14.5.

The PERT chart portrays a project as a network diagram consisting of numbered nodes (either circles or rectangles) representing project tasks. Each node is numbered and shows the task, its duration, the starting date, and the completion date. The direction of the arrows on the lines indicates the sequence of tasks and shows which activities must be completed before the commencement of another activity. In Figure 14.5, the tasks in nodes 2, 3, and 4 are not dependent on each other and can be undertaken simultaneously, but each is dependent on completion of the first task. PERT charts for complex projects can be difficult to interpret, and project managers often useboth techniques.

These project management techniques can help managers identify bottlenecks and determine the impact that problems will have on project completion times. They can also help systems developers partition projects into smaller, more manageable segments with defined, measurable business results. Standard control techniques can successfully chart the progress of the project against budgets and target dates, so deviations from the plan can be spotted.

Increasing User Involvement and Overcoming User Resistance
Projects with relatively little structure and many undefined requirements must involve users fully at all stages. Users must be mobilized to support one of many possible design options and to remain committed to a single design. External integration tools consist of ways to link the work of the implementation team to users at all organizational levels. For instance, users can become active members of the project team, take on leadership roles, and take charge of installation and training. The implementation team can demonstrate its responsiveness to users, promptly answering questions, incorporating user feedback, and showing their willingness to help.

http://siteeconomics.blogspot.com/2016/10/controlling-risk-factors-project-management.html

http://siteeconomics.blogspot.com/2016/10/controlling-risk-factors-project-management.html
Participation in implementation activities may not be enough to overcome the problem of user resistance to organizational change. Different users may be affected by the system in different ways. Whereas some users may welcome a new system because it brings changes they perceive as beneficial to them, others may resist these changes because they believe the shifts are detrimental to their interests. If the use of a system is voluntary, users may choose to avoid it; if use is mandatory, resistance will take the form of increased error rates, disruptions, turnover, and even sabotage. Therefore, the implementation strategy must not only encourage user participation and involvement, but it must also address the issue of counterimplementation . Counterimplementation is a deliberate strategy to thwart the implementation of an information system or an innovation in an organization.

Strategies to overcome user resistance include user participation (to elicit commitment as well as to improve design), user education and training, management edicts and policies, and better incentives for users who cooperate. The new system can be made more user friendly by improving the end-user interface. Users will be more cooperative if organizational problems are solved prior to introducing the new system. The Interactive Session on Organizations illustrates some of these issues at work. Westinghouse Electric Company launched a sweeping systems modernization program that included re-implementation of its enterprise applications. As you read this case, try to determine how Westinghouse addressed the risks and challenges of this project.
ADS
Controlling risk factors project management 4.5 5 eco Monday, October 24, 2016 Various project management, requirements gathering, and planning methodologies have been developed for specific categories of implementatio...


No comments:

Post a Comment

Powered by Blogger.